Wollam Construction completed a world class Sorensen Tipple Project for Westmore...
Expending over 56,000 work hours in eight months and completing 30-days ahead of...
Wollam Construction, with support of Roberts & Schaefer Company, GSL Electric, a...
Coal Handling Facility for Bridger Coal Company. 6,000 TPH coal facility. The ...
Wollam Construction completed the steel erection of the Kennecott Bingham Canyon...
This project consisted of structural steel installation, process piping, and ins...
This project consisted of earthwork, excavation, backfill, sheetpiling/shoring, ...
This project had over 10,000 LF of process piping. Other work consisted of eart...
35,000 SF manufacturing facility in Paige, Arizona. The work consisted of earth...
Performed the structural/mechanical installations on a 10,000 TPH in-pit crusher...
The project consisted of earthwork, pipe piles, concrete, structural steel erect...
This project consisted of earthwork, mass concrete foundations, structural steel...
Wollam Construction excavated, formed, and placed concrete for three portals for...
Wollam, with a business associate, pre-assembled a over width and over height co...
With the use of a 300 ton Manitowoc crane, Wollam Construction completed the rem...
Wollam completed the reconditioning of an existing truck and distribution termin...
During a mine plant shutdown, Wollam removed obsolete equipment and supplied and...
Wollam Construction completed the civil/structural portion of a new direct chill...
Wollam handled the fabrication, structural steel and roofing related installatio...
Wollam completed a mine truck shop expansion for a major Utah coal producer. The...
Wollam erected the structural steel and set crusher, conveyors and chutework for...
Wollam installed a new gold processing, carbon absorption plant near Mohave, Cal...
Wollam performed all supervision, labor, construction equipment and material for...
Wollam performed earthwork and structural concrete installations for a new truck...
Wollam completed the earthwork, dewatering, concrete, structural steel fabricati...
Wollam performed the earthwork, concrete, structural steel fabrication, steel er...
Wollam supplied/installed structural concrete, structural steel, chutework, carb...
Wollam erected the structural steel, mechanical equipment, chutework, handrail a...
Wollam performed the structural excavation/backfill , sheetpiling, dewatering sy...
Install a rotary calciner (45Ton) for a company that manufactures a catalyst use...
Wollam relocated heavy process equipment from a client's Los Angeles, California...
Supplied and Installed 18" heavy duty polyethylene piping (HDPE) for a gold mine...
Demolition, excavation, backfill and structural concrete installation at an oper...
Wollam installed mechanical equipment, structural steel, tanks and process pipin...


























 ton rough terrain crane.jpg)
.jpg)


 with a two crane pick.jpg)