Wollam performed earthwork and structural concrete installations for a new truck wash facility for 170 ton trucks.  Subcontracted portions of the project included providing/installing pre-cast double tee concrete walls, built-up roofing, and mechanical boiler system.

Highlights

  •   Remote job site at a high elevation

Photo Gallery (Click any photo to see a larger view)

wccPicPhosphateMine01.jpg (77669 bytes)
Earthwork and structural concrete for a sump inside the truck wash facility.
wccPicPhosphateMine02.jpg (51364 bytes)
Interior wash bay showing a heated slab system prior to concrete placement.
wccPicPhosphateMine03.jpg (56169 bytes)
Tilt-up pre-cast 40' double tee concrete walls and large airport hanger type access doors.
 

 