Truck Wash Facility
(Mining - Phosphate)
Wollam performed earthwork and structural concrete installations for a
new truck wash facility for 170 ton trucks. Subcontracted portions
of the project included providing/installing pre-cast double tee concrete
walls, built-up roofing, and mechanical boiler system.
|
Highlights
- Remote job site at a high elevation
Photo Gallery (Click any photo to see a larger view)
 |
Earthwork and structural concrete for a sump inside the truck
wash facility.
|
 |
Interior wash bay showing a heated slab system prior to concrete
placement.
|
 |
Tilt-up pre-cast 40' double tee concrete
walls and large airport hanger type access doors.
|
|