Home ] Up ] Contact Us ] Contents ] Search ]      

      Heavy Industrial Contractor

 
 
 
 

Bulk Storage Facility

(Mining - Fly Ash Industry)

Wollam completed the reconditioning of an existing truck and distribution terminal for the fly ash industry.  The California project included reconditioning of existing equipment and structures and the installation of new process equipment and piping.

Photo Gallery (Click on any photo to see larger view)

wccPicFlyAshTruckTerminal01.jpg (45763 bytes)
Installation of new 12" air slides to transport fly ash from the storage silos to the truck loadout.
wccPicFlyAshTruckTerminal02.jpg (48320 bytes)
Installation of new slide through a reconditioned steel silo.
wccPicFlyAshTruckTerminal03.jpg (53243 bytes)
Installed 12" carbon steel piping used to transport fly ash from the storage silos to the loadout silos. 
wccPicFlyAshTruckTerminal04.jpg (41025 bytes)
Installation of refurbished pump used to pump fly ash into silos.
 

 

Send webmaster mail to obateman@hotmail.com .   http://www.buyersdream.net 
Copyright © 2002 Wollam Construction Company, Inc.
Last modified: January 01, 2003