Coal Conveyor Relocation

(Mining - Coal)

With the use of a 300 ton Manitowoc crane, Wollam Construction completed the removal of an existing 54" wide conveyor system, transported the truss sections 65 miles, reconditioned and delivered the sections to a new coal mine site.

Highlights

  •  Over width loads moved with assistance of the Highway Patrol
  •  High critical lifts made safely
  •  Repeat customer

Photo Gallery (Click any photo to see larger view)

wccPicMoveConveyor65Miles01.jpg (42345 bytes)
View looking west of the 54" conveyor truss section that is being removed.
wccPicMoveConveyor65Miles02.jpg (35044 bytes)
300 ton crane hooked on to a one hundred foot section of the 54" conveyor structure.
wccPicMoveConveyor65Miles03.jpg (37723 bytes)
300 ton crane and 120 ton crane preparing to remove 100' section of 54" conveyor truss.

wccPicMoveConveyor65Miles04.jpg (64563 bytes)  

Transporting 22' wide conveyor truss sections 65 miles on a major highway to be refurbished and then delivered to a new mine site. 
 

 