Coal Conveyor Relocation
(Mining - Coal)
With the use of a 300 ton Manitowoc crane, Wollam
Construction completed the removal of an existing 54" wide conveyor
system, transported the truss sections 65 miles, reconditioned and
delivered the sections to a new coal mine site. |
Highlights
- Over width loads moved with assistance of the Highway Patrol
- High critical lifts made safely
- Repeat customer