| | In-Pit Crusher Relocation Project
(Mining - Kennecott Utah Copper Corporation)
Performed the structural/mechanical installations on a 10,000 TPH in-pit
crusher relocation. Work activities included the assemblies of transfer
stations, 72" conveyors, 120" belt feeder, chute and plate work,
electrical E-House installations and start-up activities.
|
Project Highlights
- Early Completion & Safety Bonus were realized
- Work performed in an existing/operating mine
- 10 day - 24 hour/day crusher shutdown
- Utilized computer generated Critical Lift Plans
Photo Gallery (Click picture
for larger view)
 |
72" conveyors with 1500 HP motors
|
 |
Relocated crusher with associated dust collection system.
|
 |
Installing pre-assembled 120" belt feeder with 2 each 300 ton cranes.
|
 |
Erection of conveyor transfer station.
|
 |
View of a 72" conveyor from the
transfer station as the conveyor belt is being installed.
|
 |
Installation of a tramp iron magnet,
weighing 45 ton, onto a 120" belt feeder.
|
 |
Relocating a Siemens manufactured
(electrical) E-House.
|
 |
Relocating a 1500 HP tail section (230 kips) during a shutdown activity.
|
|