In-Pit Crusher Relocation Project

(Mining - Kennecott Utah Copper Corporation)


Performed the structural/mechanical installations on a 10,000 TPH in-pit crusher relocation. Work activities included the assemblies of transfer stations, 72" conveyors, 120" belt feeder, chute and plate work, electrical E-House installations and start-up activities.
 

Project Highlights

  •   Early Completion & Safety Bonus were realized
  •   Work performed in an existing/operating mine
  •   10 day - 24 hour/day crusher shutdown
  •   Utilized computer generated Critical Lift Plans

Photo Gallery    (Click picture for larger view)        

KucCrusher002.jpg (58033 bytes)
72" conveyors with 1500 HP motors  
Click for larger view

Relocated crusher with associated dust collection system.

Click for larger view

Installing pre-assembled 120" belt feeder with 2 each 300 ton cranes.

Click for larger view

Erection of conveyor transfer station.

Click for larger view

View of a 72" conveyor from the transfer station as the conveyor belt is being installed.

Click for larger view

Installation of a tramp iron magnet, weighing 45 ton, onto a 120" belt feeder.

Click for larger view

Relocating a Siemens manufactured (electrical) E-House.

Click for larger view

Relocating a 1500 HP tail section (230 kips) during a shutdown activity.

 

 